8.2.3. Air flowmeter

Removal

PERFORMANCE ORDER
1. Remove the shtekkerny socket (shooter) from a flowmeter of air (B2/5), previously having weakened a cap nut on the socket.
2. Weaken a collar of fastening (4/7).
3. Weaken a collar (4/13) and Take an air flowmeter.
4. Check a sealing ring of round section (4/1) for absence of damage and porosity, if necessary replace it.

Installation

PERFORMANCE ORDER
1. Establish an air flowmeter with a sealing ring of round section.
2. Hardly tighten a hose collar and clamp a fastening collar.
3. Spread the shtekkerny socket, hardly put a cap nut until it is not recorded with click.